Skip to content

October 27, 2011

scaffoldblog

TIMELINE OF HOW A SCAFFOLD COMPANY SAVED AN ICON – in less than 24 hours!

At 1:51 pm on Wednesday 8/23/11 an earthquake of 5.8 magnitude rocked the east coast.  It was followed by two smaller aftershocks of 2.8 & 2.2.  On the whole, structural damage was fairly limited – given the wide scope of the quake.

Immediately, inspectors were sent out to every scaffold job site to make sure nothing had shifted, moved, or changed with the scaffolding around any of the structures.  As the world found out – there were a few national structures that were damaged, such as the Washington Monument and the National Cathedral.  But up in Camden, NJ a national treasure was teetering on the brink of disaster.

Medium Shot of the statue on top of the building with scaffolding

The statue on top of Our Lady of Lourdes Medical center had shifted and broken.  The big fear was that an aftershock would topple the statue…

View original post 384 more words

Advertisements

From → Uncategorized

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: